We're proud of all our projects.
Here are some that we'd like to share with you.
Aqua-Fit Centre
The Challenge
The Aqua-Fit Centre's pool and change room lighting was dim, dark, and uneven. The community rec centre needed an economical fix to ensure safe and effective light levels throughout the facility.
The Solution
A full replacement of existing lighting, including LED high-bay fixtures throughout the pool area. Wave designed a plan to minimize construction costs and meet the pool's scheduled facility shut down.
Location
Beaumont, AB
Leduc Downtown Vitalization
The Challenge
Revitalize a downtown core and main street. Provide a forward-looking design that also aligns with the character and history of the existing businesses.
The Solution
A full streetscape improvement including new roadway lighting, way-finding signs and features, decorative tree and feature lighting, and power for seasonal events. Includes full stakeholder engagement and community consultation.
Location
Leduc, AB
UofA's Presidents' Circle
The Challenge
Create a custom architectural lighting solution to illuminate key pedestrian focal points and to enhance this tribute of past Presidents at the U of A.
The Solution
Full lighting simulation and photorealistic renderings to ensure zero construction rework. A power distribution design to interface with existing site utilities, plus on-site support during construction and commissioning.
Location
University of Alberta, Edmonton AB
Lakeshore Drive Redevelopment
The Challenge
Refresh and reinvigorate twelve blocks of lakefront promenade in one of Alberta's most popular beach towns.
The Solution
Full streetscape improvements, including decorative and feature lighting, new roadway lighting, and power for seasonal events. Includes electrical engineering services from planning and stakeholder engagement to detailed design and support during construction.
Location
Sylvan Lake, AB
Wembley Sports Field
The Challenge
A community focal point needed a cost-effective way to light their field for year round enjoyment. Football games shouldn't need to end when the sun sets.
The Solution
Professional-grade football field lighting and an electronic score board are added to the local field. Lighting levels designed to Class III level of play. Electrical engineering services included community consultation and area lighting analysis & analysis.
Location
Wembley, AB